Energy Audits
Preliminary audit
 
The preliminary audit (alternatively called a simple audit, screening audit or walk-through audit) is the simplest and quickest type of audit. It involves minimal interviews with site-operating personnel, a brief review of facility utility bills and other operating data, and a walk-through of the facility to become familiar with the building operation and to identify any glaring areas of energy waste or inefficiency.
 
Typically, only major problem areas will be uncovered during this type of audit. Corrective measures are briefly described, and quick estimates of implementation cost, potential operating cost savings, and simple payback periods are provided. This level of detail, while not sufficient for reaching a final decision on implementing a proposed measure, is adequate to prioritize energy-efficiency projects and to determine the need for a more detailed audit.
 
 
General Audit

The general audit (alternatively called a mini-audit, site energy audit or detailed energy audit or complete site energy audit) expands on the preliminary audit described above by collecting more detailed information about facility operation and by performing a more detailed evaluation of energy conservation measures. Utility bills are collected for a 12 to 36 month period to allow the auditor to evaluate the facility's energy/demand rate structures and energy usage profiles. If interval meter data is available, the detailed energy profiles that such data makes possible will typically be analyzed for signs of energy waste. Additional metering of specific energy-consuming systems is often performed to supplement utility data. In-depth interviews with facility operating personnel are conducted to provide a better understanding of major energy consuming systems and to gain insight into short and longer term energy consumption patterns.
 
This type of audit will be able to identify all energy-conservation measures appropriate for the facility, given its operating parameters. A detailed financial analysis is performed for each measure based on detailed implementation cost estimates, site-specific operating cost savings, and the customer's investment criteria. Sufficient detail is provided to justify project implementation.